Werkstätte Liechtblick Schaffhausen


WÜB ZIEGELEI EIBEL, INWIL


The challenge

A substructure comprising as few brackets as possible is required for the installation of the natural slate cladding. The substrate is weak in places.


The Ecolite solution

On the basis of pull-out tests, the bracket base can be optimized for the permissible loads, which means that, despite the substrate being weak in places, only a small number of brackets need to be installed.


Ecolite products

Primary substructure constructed using Thermo H brackets and horizontal angle profiles from the HM system.


Image gallery

IMG_6915_1440x1012.jpg

IMG_6915_1440x1012.jpg

IMG_6882_1440x1012.jpg

IMG_6882_1440x1012.jpg

IMG_6901_1440x1012.jpg

IMG_6901_1440x1012.jpg

IMG_6903_1440x1012.jpg

IMG_6903_1440x1012.jpg

IMG_6889_1440x1012.jpg

IMG_6889_1440x1012.jpg

IMG_6887_1440x1012.jpg

IMG_6887_1440x1012.jpg

IMG_6907_1440x1012.jpg

IMG_6907_1440x1012.jpg

IMG_6913_1440x1012.jpg

IMG_6913_1440x1012.jpg

Click on a photo to see an enlarged view.
Realization: Schmid Bauunternehmung AG, Ebikon

Login